Skip to content
Booking surveys now for the spring building season.
Monday – Friday: 7:30 am – 4:30 pm · Saturday: By appointment · Sunday: ClosedMonday – Friday: 7:30 am – 4:30 pmHome Improvement Contractor · NY Lic. 000000(845) 555-0100

Pricing

How we price an old building

  • What decides the price

    In an old building the price follows the condition, not the square footage. The survey tells us which of these apply.

    • How much of the frame is sound

    • Access: a bank barn is not a ranch house

    • What was altered and has to be undone

    • Materials: salvaged or milled timber, lime, true divided glass

    • Permits, and any historic-district review

  • What the estimate includes, and what it doesn't

    The estimate lists each job from the fix-now pile with its scope, the allowances we've set and what we've left out.

    • Included: scope by room or bay, materials, named allowances, who is on site, the weeks it takes

    • Not included: permit fees, an engineer's stamp, conditions found later, anything on the leave-alone pile

  • What happens at the survey

    Two of us, most of a day. Clear a way to the cellar and the attic, and tell us what worries you. The survey is a paid visit; its fee is in your booking confirmation.

  • If we open a wall and find something

    Rot behind a sill, a beam cut for a pipe, knob-and-tube wiring in the attic. We stop, show you with photos, and write a change order with its price before we go on. Nothing is billed that you haven't seen.

  • When you get the number

    In writing, after the survey. Jobs in the fix-now pile get a fixed price. Fix-next jobs get a price good for the season we name. Hourly billing is for work that can't be scoped, and we say so before we start.

No prices here: the building's condition sets them, and the survey is how we find it.

Paying

Deposits and payments

The schedule is written into your contract and follows New York rules.

  • At signing

    A deposit, as New York rules allow, to schedule the crew and order timber.

  • During the work

    Payments tied to stages of the work, not to dates.

  • At the end

    The last payment is due after the walk-through, when the work is finished.

  • Borrowing

    We don't arrange financing. If you plan to borrow, ask your bank before the survey, and we'll give them the estimate.

Why no averages

We don't print an average

An average of old buildings is a number nobody has paid. A stone farmhouse with a sound frame and a barn that is leaning don't cost the same to repair, even when they are the same size.

So we print what moves the price, and we put the number in writing after the survey. If a price here would have helped you decide whether to call, the survey fee is the price to ask for.

Ask for the survey

The survey fee is quoted when you book.